Skip to main content
Call today for a FREE Quote:  (623) 283-1420

When you decide to invest in a high-end pool cover, your focus is naturally on the finished product: the safety, the clean look, the convenience. What is often overlooked is the installation process itself—a period of construction that can turn your backyard sanctuary into a chaotic, messy, and disruptive work zone. The complexity and invasiveness of the installation can be a significant hidden cost, not in dollars, but in stress and inconvenience.

Before you commit to a solution, it's vital to understand what the installation truly entails. Some systems require what amounts to a major construction project, involving drainage, excavation, and electrical work. In contrast, a more modern, self-contained system can deliver a superior result with a fraction of the disruption. Understanding this difference is key to choosing a solution that respects your home, your time, and your peace of mind.


The Hidden Disruption of Automatic and Hard Top Covers

Installing a sophisticated mechanical pool cover is rarely a simple, one-day affair. The process for these systems, particularly for recessed or custom-fit models, can be surprisingly invasive.


What to Expect from a Mechanical Cover Installation:

  • Pool Draining: Often, the pool must be partially or fully drained to allow for the installation of tracks and housing vaults.
  • Deck Demolition: To create a recessed "invisible" track system, installers must cut or demolish sections of your existing concrete or paver deck. This creates significant dust and debris.
  • Excavation: A large pit or vault is often dug at one end of the pool to house the motor and rolled-up cover. This means heavy equipment and piles of dirt in your yard.
  • Electrical Trenching: Licensed electricians must run power to the motor, which may involve digging trenches across your lawn or patio for the conduit.
  • Extended Timeline: A complex installation can take several days or even a week, leaving your backyard in a state of disarray and unusable for the duration.

The promise of a sleek, clean look at the end is preceded by a period of significant noise, mess, and disruption to your daily life. The final pool cover installation cost should always factor in the cost of this inconvenience.


The Freedom Decks Alternative: A Cleaner, Faster Process

A pool-to-deck conversion is a fundamentally different type of construction project. Because the entire system is built inside the existing pool shell, the impact on the rest of your backyard is dramatically reduced.


The Self-Contained Installation Process Checklist:

Installation Step Automatic / Hard Top Cover Freedom Decks Conversion
  Major Demolition Required?
Yes (Often for tracks/vault) No
 Heavy Excavation Needed?
Yes (For motor housing) No
 New Electrical Wiring? Yes (Requires trenching) No
 Work Area Contained?
No (Affects entire yard) Yes (Inside the pool shell)
 Typical Project Duration 3 - 7 days 2 - 5 days
 Level of Disruption High Minimal

The Freedom Decks team works within the confines of your pool. Materials are brought in, the frame is constructed, and the decking is laid, all without turning your lawn into a mud pit or covering your patio furniture with concrete dust. It's a faster, cleaner, and more respectful approach to home improvement. This streamlined process is a key benefit, especially for those seeking custom pool covers for inground pools where complexity can otherwise lead to major project delays.


A Story of Two Installations

Fictional case study based on common homeowner experiences: Consider two neighbors in Sun City, both deciding to cover their unused pools. Mr. Smith chose a high-end, recessed automatic cover. His installation involved a week of noise from jackhammers cutting into his deck, a mini-excavator digging a trench, and days of construction traffic. His prized rose bushes were covered in a layer of fine dust.

Mrs. Jones, next door, chose a Freedom Decks conversion. A small, professional crew arrived. They worked cleanly and efficiently, with all activity taking place inside the pool area. In three days, they were gone, leaving behind a beautiful, finished deck and a pristine yard. Mrs. Jones enjoyed her new patio that weekend, while Mr. Smith was still washing concrete dust off his windows. While both ended up with inground pool covers, their experiences getting there were worlds apart.


Choose a Process as Clean as the Final Product

The final outcome is important, but the journey to get there matters, too. A pool cover installation shouldn't be a source of stress and disruption that makes you regret your decision. The invasive, multi-stage process required for many automatic and hard covers stands in stark contrast to the clean, self-contained method of a pool-to-deck conversion. By choosing a solution that is engineered for minimal impact, you get a superior result without turning your backyard upside down.


Frequently Asked Questions

Will your installation process damage my existing pool deck or landscaping?

No. Because our entire system is built inside the pool shell, our work has virtually no impact on your surrounding patio, lawn, or landscaping. We pride ourselves on leaving your yard as clean as we found it.

Is there a lot of noise and dust during a deck conversion installation?

The process mainly involves carpentry work—cutting and fastening the frame and decking. While there is some noise from saws and screw guns, it is far less disruptive than the concrete saws and jackhammers often required for mechanical cover installations.

How soon can I use my new deck after installation is complete?

You can use your new deck immediately. As soon as our crew finishes the final cleanup, the space is yours to furnish, decorate, and enjoy. There is no waiting for concrete to cure or for systems to be tested.


 

Tags: